Important events
首頁School HistoryImportant eventsIdeal about running a school

Year

Month

Important Events

1917

April

Ratified as a branch called Bei-Dou Public School (Siao Pu Sin Branch.)

1920

April

Ratified as an independent school called Siao Pu Sin Public School.

1920

April

Establishment of the Lu Kou Cuo branch of the School (Fen Jiao Chang)

1920

April

Establishment of Niou Chou Zih branch of the School (Fen Jiao Chang)

1926

April

Lu-Kou Cuo School becomes the independent Lu-Kou Cuo Public School.

1926

May

PrincipalGou San Lang

1928

April

PrincipalJhong Cun Ding

1929

April

Niou Chou Zih School becomes the independent Niou Chou Zih Public School.

1935

April

PrincipalJia Teng You Ci Lang.

1936

April

Establishment of Pi-Tou School

1940

April

PrincipalCun Ye Jhen Syong

1941

April

The school changes its name to Pi-Tou National School.

1941

October

PrincipalSyu Yong-He

1946

February

Pi-Tou School (Fen Jiao Chang) becomes an independent school.

1946

March

The school changes its name to He-Sing National School.

1946

March

PrincipalJhan Cing-Hai

1954

September

PrincipalWu Ke-Syun

1956

September

Establishment of the Fong-Lun Branch

1962

August

Fong-Lun Branch becomes an independent school.

1962

September

PrincipalWang Shu-Jin

1967

April

50th Anniversary celebrations of the school

1968

May

PrincipalJhang Chong-Ci

1968

September

The school changes its name to He-Sing Elementary School.

1970

April

Podium next to the sports field is built.

1970

July

Building of the fountain, a storeroom and two classrooms.

1970

July

Principal Jhang retired.  Mr. Wu Ci-Zih becomes the acting principal.

1970

July

Principal—Wu Cing-Li

1971

September

The Auditorium is upgraded.

1971

October

The cement wall in the dormitory area is built.

1971

December

Five old and dangerous classrooms are demolished and rebuilt.

1972

April

The lawns, flowers and trees are planted.

1972

June

Laying of asphalt on the campus.

1972

June

The central corridor is built.

1972

July

The elephantlike slide is constructed.

1973

January

A classroom is demolished and a storehouse is built.

1974

September

Purchase 60 sets of desks and chairs

1974

September

The auditorium, classrooms, rest rooms are redecorated, and the incinerator is rebuilt.

1975

October

Principal—Hou Yong-Sin

1977

July

Three classrooms and a rest room are rebuilt.

1978

March

Principal Hou retires voluntarily; Mr. Yan Cing-Shuei, director of Academic Affairs, becomes the acting principal.

1978

April

Two classrooms are rebuilt and two blackboards are replaced.

1978

May

Another 5760 spare feet of asphalt is laid.

1978

September

Principal—Jhang Liang-Jhu

1978

July

A new classroom built.

1981

July

A new classroom and staircase built.

1982

July

A new classroom and staircase built.

1983

July

A new classroom and staircase built.

1985

July

Roof is changed from a tile roof to flat roof

1986

March

Establishment of the subsidiary kindergarten of He-Sing Elementary School.

1986

July

The building of two specialized classrooms and a counselor’s office.  Installed water and heat proofing of the roof in four rooms..

1986

July

Building of a classroom and rest room for the kindergarten.

1987

May

Building of a Natural Science classroom, a Music room and two libraries.

1988

August

Principal—Syu Chao-Gen

1992

April

Building of two libraries, two specialized classrooms and two rest rooms.

1993

August

Building of 14 normal classrooms, and three modernized rest rooms (one in East Building and the other two on the 2nd floor of the kindergarten)

1994

October

Laid around 200 meters of asphalt in front and rear of the East Building.

Built four green decks.

Planted flowers, trees, lawns, and plants.

Purchased furniture for Principal’s Office, Conference Room and Offices.

Built sheds for the parking lot and rain shelters.

1995

July

Construction of two modernized rest rooms, ten audiovisual facilities, and a broadcasting room.  Installation of twelve drinking fountains.

1995

July

Principal Syu Chao-Gen retires.

1995

August

Principal—Wu Su-Bi

1997

June

Completed the construction of the classrooms in the Northern Building and the two-hundred-meter athletics track made with red brick powder.

1998

June

Receives the mandate for using state-owned land.

1998

August

Staff dormitory dismantled and the returning of land which was acquired during the Japanese occupation period.

1999

March

Integrated field built.

1999

June

Construction of six classrooms in the Western Building

1999

June

Installed 40 computers and servers in the Computer Classroom.

1999

July

Constructed West wall, northern gate and an additional two-hundred-meter of sealed wall.

2000

March

Constructed the main gate and 84-meter sidewalk.

2000

April

Constructed six classrooms on the 2nd floor of the West Building, and rearranged the facilities and wall paintings.

2000

April

Dismantled six classrooms of the Southern Building and planted vegetation.

2000

June

Built 80-meter Northern wall, and 57-meter roofed parking lot.

2000

October

Planted Syzygium formosanum (Hayata) Mori around the walls.

2000

December

Planted carpet grass and golf course grass.

Laying of small stones on the playground.

2001

March

Added three flower beds around the septic tank at the rear of the office.

2001

April

Installed steel ceiling and three air-conditioners in the computer classroom.

2001

July

Improved drinking water facilities.

Project for separating tap water and underground water.

2001

September

Installed watering facilities around campus and kindergarten.

2001

October

Purchased TV set, Videotape Player, and Audio-Visual Unit for Grade one.

2001

November

Decorated ceilings of the Eastern Building.

2001

December

Painting of the slide, the Northern wall and the vision map on the corridor.

2002

February

Painting of the corridor and wall in the kindergarten.

2002

February

Installed lighting in the classrooms of the Western Building and kindergarten.

2002

March

Installed a wooden floor, fire proof curtains, closet for quilts, and sinks in the kindergarten.

2002

March

Completed the middle-term plan for school administration development from 2002 to 2006.

2002

June

Won the top honor in the evaluation of Information Technology Education.

2002

June

Won the high-class honor in the kindergarten evaluation.

2002

August

Completed laying safety mats in the physical training section.

2002

August

Renewed the roof of the shed.

2002

September

Completed laying safety mats in the kindergarten.

2002

September

Purchased VCD, platforms, desks, chairs and so on.

2002

October

Dismantled two rooms of the staff dormitory.

2002

October

Ecological area and sewers constructed.

2002

October

County government subsidizes a computer for administrative use in the Principal’s Office.

2002

October

The renamingof three buildings on the campus to the Yu-Ying Building, Cin-Syue Building, Ci-Meng Building.

2003

February

Pruned the trees on the campus.

2003

April

Establishment of the School History Building.

2003

June

Four persons from human resources begin serving at the school.

2003

August

Purchase two drinking fountains.

2003

August

Installed lighting and fans in the Cin-Syue Building and on the first floor of Ci-Meng Building.

2003

September

Completed the construction of nine classrooms’ floors on the first floor of the Cin-Syue Building.

2003

September

Laid safety mats and garden bricks in the playground.

Purchased two seesaws and a scaling ladder.

2003

September

Purchased TVs, DVD players and TV units for Grade 2 and 3.

2003

November

Laid safety mats and safety ramp on the corridors in the kindergarten.

2003

November

The Farmer’s association of Pi-Tou Township subsidizes the funds for the painting of the old wall in front of the garden.

2003

November

The Farmer’s association of Pi-Tou Township subsidizes plants for the ecological area.

2003

November

Purchases nine sets of lockers for Grade 3 and 4.

2003

November

The kindergarten purchases equipment for those with mental and physical disabilities.

2003

November

Purchases DV, digital camera, computers and printers for the Information Seed project..

2003

December

Dismantled a storeroom and an apparatus room, and constructed a simple storeroom.

2003

December

He-Sing Community Development Association exhibits a tank at the Northern Gate of the campus to embellish the campus.

2003

December

Purchases laptop computers, projector screens, computers and printers for the Information Seed project.

2004

January

Bricked the garden sidewalk on the Western side of the campus.

Laid asphalt at the rear of the Ci-Meng Building.

2004

January

Established two flower beds in front of the Yu-Ying Building and a third on the Western side of the Cin-Syue Building.

Copyright (c) 1999-2002 Chang-hua County Ho-Sin Elementary School. All rights reserved.